Bringing high level craftsmanship to transmission & distribution networks

CASE STUDIES

Skegness 33kV Substation, Lincolnshire

Western Power Distribution (WPD) have decided to build a new brick built switch room to replace the existing ’weather beater’ style construction at Skegness 132/33V Substation. The works required were to undertake the installation and jointing of onsite EHV cables (both permanent and interconnection works) & the circuit transfers.

The works were successfully completed on time & budget.

Scope:

  • · Installation of 7 x sets of 3 33kv 400mm separable connectors
  • · Installation of 7 x sets of 3 33kv Euromold surge arresters
  • · Installation of 4 x sets of 3 33kv 630mm size 3 pfisterer inner cone plug terminations
  • · Installation of 2 x sets of 3 33kV size 3 pfisterer inner cone dummy plugs
  • · Installation of 1 x sets of 3 33kv single core transitional straight joints (1c H Type PILC – 1c EPR)
  • · Installation of 1 x sets of 3 33kv single core 400mm XLPE straight joints (XLPE – XLPE)
  • · Installation of 5 x 33kv transitional Trifurcating joints (3c H type PILC – 3x 400mmm EPR)
  • · Installation of 6 x sets of 3 33kv single core 630mm XLPE straight joints (XLPE – XLPE)
  • · Supply & installation of cable management within the cable basement
  • · Site supervision / standby & project management for all contracted works
  • · Excavation & reinstatement of all trenches & joint bays
  • · Installation of 7 x 3 phase sets of 400mm EPR 33Kv feeder Circuits
  • · Installation of 4 x 3 phase sets of 630mm EPR 33Kv Grid Transformer Circuits
  • · Provision of marked up as built drawings For Installed Cable Routes

 

BACK CONTACT US

TESTIMONIALS

CALL US ON  01939 233 009 or 07802 366217