33kV onsite works - Coal Clough Windfarm, Nr Burnley, Lancashire.

Wind Farm operator Scottish Power Renewables own & operate Coal Clough Wind farm.  They contracted Freedom Agrilek to carry out all of the 33KV onsite cabling works.

Wootton & Wootton were contracted to carry out all jointing, terminating & testing elements of the complete 33KV network.

Scope of Works.

  • To install 4 sets of size 3 33kV Pfisterer inner cone plugs.
  • To install 1 x set of 3 33kV size 3 Pfisterer surge arrestors.
  • To install 17 x sets of 33kV Euromold separable connectors.
  • To install 8 x sets of 33kV Euromold separable connectors on the 3c turbine downlead cables.
  • To install 1 x set of 3 33kV Tyco straight joints
  • Successfully carryout VLF pressure test the complete 33kV network.
  • Successfully carryout DC sheath test cable upon completion.

Summary.

With a very tight programme our teams managed to complete the works on time & budget.