Works were carried out at Hinksford Substation in Staffordshire for Western Power Distribution followin installtion of new switchgear. 

Wootton & Wootton carried out onste excavation, cable installation works and 33kV jointing.

 

All works were carried out as expected and to full client satisfaction.

  • Excavated & Reinstated 140m of trench
  • Excavated & Reinstated all Joint Bays
  • Installation of 3 x sets 33kV 400mm EPR feeder Circuits
  • Installation of 2 x sets 33kV 400mm EPR Grid Transformer Circuits
  • Installation of 1 x sets 33kV transitional straight joints (PILC - EPR)
  • Installation of 3 x sets 33kV 400mm XLPE-EPR straight joints
  • Installation of 2 x sets 33kV size 3 Pfisterer inner conn plug in terminations
  • Installation of 4 x sets 33kV 400 series Euromold separable connectors
  • Installation of 3 x sets 33kV Euromold surge arrestors
  • Installation of 3 x Pfisterer size 3 dummy plugs
  • All site supervision and standby duties within the live 33kV AIS compound.

 