Western Power Distribution (WPD) have decided to build a new brick built switch room to replace the existing ’weather beater’ style construction at Skegness 132/33V Substation. The works required were to undertake the installation and jointing of onsite EHV cables (both permanent and interconnection works) & the circuit transfers