Due to relocation of the existing OCGT (Open Cycle Gas Turbine), Power station owner & operator NPower needed to relocate the existing 11kV switch room to allow for the decommissioning & demolition of Didcot B Coal fired Power station meaning considerable rerouting of cables and jointing works.